Operation; Patient Preparation; Starting Treatment; Stopping Treatment - Chattanooga Fluidotherapy FLU110D Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

PATIENT PREPARATION

Clean the patient treatment area thoroughly with an antimicrobial
soap and clean water as per industry, facility, regulatory standards,
and universal skin washing procedures.
Following the skin washing procedure, apply a hospital grade
antiseptic skin cleanser, according to the cleanser manufacturer's
recommended instructions for use.
Reference the maintenance schedule and make certain the
preventive maintenance has been performed prior to starting the
unit.

STARTING TREATMENT

STARTING
Make certain all control panel settings have
been made, unit is preheated, and patient
is in proper position with sleeve(s) secure
prior to starting the treatment. Refer to
pages 15 - 17
for setup of the unit.
Press "START" button to begin treatment.

STOPPING TREATMENT

24
Fluidotherapy® - Dry Heat Therapy
STOPPING
Treatment will automatically stop when the
treatment time reaches zero.
Should it be desired to stop treatment
before the timer reaches zero, push the
"STOP" button.
NOTE:
Should the treatment be stopped before
the timer reaches zero, it will be necessary
to re-set the "TREATMENT TIME" in order to
complete the prescribed treatment.

Publicité

Table des Matières
loading

Table des Matières