b
1
EC5B5000
ASSEMBLY AND INSTALLATION
Handlebar
NOTE:
G
G
NOTE:
G
G
NOTE:
G
G
90˚
c
3
5 - 42
HANDLEBAR
1. Install:
Handlebar 1
G
Handlebar holder 2
G
Bolt (handlebar holder) 3
G
28 Nm (2.8 m · kg, 20 ft · lb)
The handlebar holder should be installed
with the punched mark a forward.
First tighten the bolts on the front side of the
handlebar holder, and then tighten the bolts
on the rear side.
2. Install:
Grip (left) 1
G
Apply the adhesive to the handlebar 2.
Before applying the adhesive, wipe off
grease or oil on the handlebar surface a
with a lacquer thinner.
Install the grip (left) to the handlebar so that
the line b between the two arrow marks
faces straight upward.
3. Install:
Grip (right) 1
G
Collar 2
G
Apply the adhesive on the tube guide
3.
Before applying the adhesive, wipe off
grease or oil on the tube guide surface a
with a lacquer thinner.
Install the grip to the tube guide so that the
grip match mark b and tube guide slot c
form the angle as shown.
CHAS