Fig. 1
Step 3:
Apply Spray Paint To Cut Areas
1. Using a piece of cardboard as a mask, apply the 1
Fortress zinc based touch-up paint.
2. Allow to dry before applying second coat.
3. Apply the 2nd coat of Fortress zinc based touch-up paint.
4. Allow to dry and install.
Fig. 1
2X
OTP INSTALLATION
Step 1:
Install I-Support On Panel
1. Install the panel I-support by twisting it into the center of the
bottom rail directly under a baluster. As shown in Fig. 1.
2. Position the I-support so the attachment screw can be easily
installed on the deck.
AL
Fig. 2
HOME TRADITIONAL PANEL INSTALLATION
13
Fig. 3
coat of
st
9