Pentair PRO-SOURCE 8MM05231 Notice D'utilisation page 5

Pompes submersibles de 3 po monophasées 1/2 ch – 60 hz
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONTROL BOX CHECKING PROCEDURE:
Hazardous voltage. Can shock,
burn, or cause death. Disconnect power to
control box before doing these check
procedures.
A. General Procedures. (Power to control box
disconnected)
1. Disconnect line.
2. Inspect for damaged or burned parts, loose
connections, etc.
3. Check for misconnections against diagram
in control box.
4. If box is too hot, circuit breakers may trip
or fuses blow. Ventilate or shade box.
Move away from heat source.
5. If problem has not been found, check
motor and control box. Use test
procedures that follow.
B. Ground (Insulation Resistance) Test. (Power
to control box disconnected)
1. Ohmmeter Setting: Highest scale (usually
Rx100K or Rx10,000).
2. Terminal Connections: One ohmmeter lead
to "Ground" screw on control box and
touch other lead to each of the terminals
on terminal board.
3. Ohmmeter Reading: Pointer should remain
at infinity (∞) and not deflect.
Installation Wiring Diagrams – Single Phase, 3 Wire
SINGLE PHASE - 1/2 HP THRU 5 HP STANDARD
CONTROL BOX WITH ADEQUATE RATED
PRESSURE SWITCH
Ground
To Line
L1
M1
L2
M2
Fused
Disconnect
Switch
Pressure
Switch
Red
Yellow
Black
Well
Casing
Follow color coding when connecting control box (Yellow to Y, Red to R, Black to B).
C. Capacitor Tests. (Power to control box
disconnected)
capacitor across terminals before testing.
1. Ohmmeter Setting: Rx1000.
2. Terminal Connections: Connect ohmmeter
leads to black and orange wires out of
capacitor case.
3. Ohmmeter Reading: Pointer should swing
toward "zero" and "float" back to (∞).
Capacitor is shorted if pointer does not
move back to (∞), open if it does not move
from (∞).
4. To reset capacitor, reverse ohmmeter
connection to capacitor terminals.
SINGLE PHASE - 1/2 HP THRU 5 HP STANDARD
CONTROL BOX WITH PRESSURE SWITCH (One pump
for 2 houses) With adequate rated pressure switch
To Line
CONTROL
BOX
L1 L2 R Y B
Pressure
Switch
Ground
355 0893
5
Risk of electric shock. Short
Ground
To Line
Fused
Pressure
Disconnect
Switch
Switch
L1
M1
L2
M2
L1
M1
L2
M2
CONTROL
BOX
L1 L2 R Y B
Aux. Relay
or Equivalent
Red
Yellow
Black
Well
Ground
Casing
359 0893

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Pro-source 8mm05221Pro-source 12mm05231Pro-source 12mm05221

Table des Matières