Tightening Torques (Screws Din En Iso 4762); Initial Commissioning; Normal Operation - RK Rose+Krieger SLZ 63 KG P PL Notice D'assemblage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Disassembly of the cover strips and the blind plugs.
When using a type -R- slot stone, the cover strips have to be removed or with type -N-, also the
blind plugs.
Screwdriver

7.5 Tightening torques (screws DIN EN ISO 4762)

Dimensions
M4
M5
M6
M8
M10

7.6 Initial commissioning

Only persons who have read and understood these assembly instructions completely may put the
unit into service.
The mode of function of this electric cylinder results in forces that can lead to personal injury or
property damage.
The safety provisions of the electric cylinder must therefore be observed.

7.7 Normal operation

During operation, check the electric cylinder regularly to ensure it properly functions.
During normal operation, look out for obvious changes in the incomplete machine. If defects
occur, the electric cylinder must be taken out of use immediately to prevent damage.
As a part of the complete machine assembly, the assembly instructions of the whole machine
applies in accordance with the Machinery Directive 2006/42/EC.
1.
Strength 8.8
Tightening torque
M
(Nm)
A
3.0
5.9
10
25
49
Cover strip
Blind plug
Screwdriver
2.
Strength 10.9
Tightening torque
M
(Nm)
A
4.4
8.7
15
35
72
7. Life phases
Strength 12.9
Tightening torque
M
(Nm)
A
5.1
10
15
43
84
71

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Slz 63 kg p flSlz 63 tr p plSlz 63 tr p fl

Table des Matières