See Exploded Diagram at rear of manual for parts reference
Parts Orders: (800) 516‐3636 heatredefined.com Questions: (800) 245‐6489
Convection (Room Air) Blower
Before beginning any component replacement, be certain the unit is unplugged and
thoroughly cooled down.
Remove the back panel of the unit, using a 5/16" wrench.
If it is a side‐mount control board, the control (circuit) board may need to be removed, by
removing the two 5/16" screws and pulling the control board out of the stove. Some wire
ties may need to be cut so that the board can be pulled out of the way of the blower
(remember to replace them).
Locate and detach the power leads to the convection blower.
Using a socket with a long extension, loosen and remove the (4)
blower to the stove; remove the blower from the stove.
Installation of the new blower is performed in reverse of removal; remember to reconnect
the power leads to the blower, and replace any wire ties before reinstalling the control
board. (When installing the new blower, place the blower motor opening pointing UP,
towards the top of the stove.)
Visit youtube.com/heatredefined for detailed service 'how to' videos.
Vacuum
Switch (see
Vac. Switch
section)
IMPORTANT! READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING CLEANING THE UNIT AS SPECIFIED, AND
ENGLAND'S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR DUE TO UNSAFE INSTALLATION OR
REPLACING COMPONENTS
Convection
(Room Air)
Blower
REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.
USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS.
43
5
/
" screws which hold the
16