Installing The Operation Box - JUKI SC-922 Mode D'emploi

Masquer les pouces Voir aussi pour SC-922:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 70

3. INSTALLING THE OPERATION BOX

[ DSU, DSC, LZH-1290-7, DU-141H-7, LU-1500N, LS-1342-7, DNU-1541-7, PLC-1700-7 ]
CP-180
❸ ❹
❻ ❼
DSC
Installing position
LZH-1290-7
Installing position
DU-141H-7, LU-1500N, LS-1342-7,
DNU-1541-7, PLC-1700-7,
DSU
Installing
position
Stud
– 4 –
CP-180
(In the case of DU-141H-7, DSU)
❸ ❹
1) Install panel thread guide ❶ to the installing plate
with screw ❷ , spring washer ❸ and washer ❹
supplied as accessories. However, panel thread
guide ❶ is not installed to LU-1500N series, LS-
1342-7, and DNU-1541-7.
2) Install the operation box to the sewing machine
using screws ❺ , washers ❻ and toothed lock
washers ❼ supplied as accessories.
For the DU-141H-7 and DSU, however, screw ❽ sup-
plied with the sewing machine head should be used
instead of screw ❺ supplied with the operation box.
In the case of installing the operation box to section
A, it should be installed only with screw ❽ instead of
washer ❻ and toothed washer ❼ supplied with the
operation box.
A

Publicité

Table des Matières
loading

Table des Matières