Installation; Clearance; Unit Location - SystemAir CX 25 Manuel D'installation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

The unit is not designed to withstand weights or stresses from adjacent equipment, pipe work or
constructions. Any foreign weight or stress on the unit structure could lead to a malfunction or a
collapse with dangerous consequences for personnel and property. In such an event, the warranty
shall be null and void.

CLEARANCE

Free air circulation around the air intake and
discharge vents must not obstructed. Provide for
the necessary space for access to and removal of
the front panels.
RESPECT MINIMUM CLEARANCES SPECIFIED AROUND THE UNIT.

UNIT LOCATION

The unit base shall be arranged as indicated in the manual. There could be a risk of personal injury
or damage to property in the event of the unit being incorrectly supported.
The unit must be installed on a firm level foundation, of adequate strength to support its full operating weight.
1. It must be high enough to permit good drainage of condensates with siphon
2. The unit must be pitched slightly towards condensate drain outlet to provide positive drainage of
condensates.
3. Keep duct connections to a minimum to reduce duct losses.
4. When locating unit give consideration to, and locate unit as remote as possible minimise noise.
5. All electrical and ductwork connections to the unit must be made via flexible connections to prevent
transmission of vibration.
6. In addition to the service clearances noted on the dimension sheet it is essential that provision is
made for adequate and safe service access.
650 mm
1200 mm
8
900 mm
650 mm
650 mm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Xwc 25

Table des Matières