RECIEPT OF MACHINE
On receiving the machine(s), the first operation to be effected is a check of possible damage that can have been done during
transport.
Unless an individual agreement exists, the equipment is always supplied EX WORKS and therefore HITECSA is not liable for
any damages caused during transportation.
If any damage should be noted, this should be noted in writing on the delivery bill and made known to the
forwarding agent.
The air-conditioners are manufactured for indoor installation and therefore should not be left outdoors or in any way exposed
to bad weather conditions.
It is advisable, in any case, to leave the units in their original packing until they are to be installed.