4. INSTALLATION AND CONNECTION (continued)
4.5 Power cable with RCD - Test procedure
The heat pump comes with a 4-m power cable that includes an in-line,
30-mA residual-current device (RCD).
Perform the RCD TEST before putting the heat pump in service, before
each use of the product, and when putting it back in service after winter
storage.
Do not use the heat pump if the RCD test has failed.
Contact a qualified electrician to perform a diagnostic
and/or to replace the power cable.
1.
Plug in the RCD plug to the socket. The heat pump's indicator light turns
on, along with its display screen.
2.
Press the TEST button and you should hear a click. The heat pump's
indicator light and screen turn off.
3.
Press the RESET button. The heat pump's indicator light and screen turn
back on. If the test is successful, you can use the product.
RCD test
RESET button
Indicator light
RESET
T
TEST button
TH-10-CF PRCD
~ ~
10A 230V
I
∆
n:
30mA
11