Instructions For Initial Switch-On; Getting Started - Fulgor Milano FCPO 315 P TEM 2F Instructions Pour L'installation Et L'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 79

Instructions for initial switch-on

Once the oven has been connected to the power supply for
the first time, the control automatically prepares for setting a
number of user settings, which remain stored in case of any
subsequent switch-on.
NOTE Both at the first and subsequent connections to the
power supply, the door lock mechanism performs a
calibration run – in this phase, always keep the door
closed.
• Language
• Temperature & Weight
• Time
• Date
Refer to the USER SETTING paragraph for setting instructions.
After making the user settings, the control moves automatically
to the "Standby" display page.
TUESDAY 11/24/2015
PM
04 : 26

9 - Getting Started

EN
13

Publicité

Table des Matières
loading

Table des Matières