Prior To Installation - Tylo SENSE COMBI Pure Notice D'installation

Masquer les pouces Voir aussi pour SENSE COMBI Pure:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30

PRIOR TO INSTALLATION

Parts
Check that the following parts are included in the packaging:
2
3
4
1
5
6
7
10
9
8
Figure 1: Sauna heater/control panel parts
1.
Sauna heater
2.
Herb bowl/air humidifi er
3.
Herb bowl
4.
Brackets
5.
Warning sticker in ten languages
6.
Sauna fragrance x 1
7.
Connectors x 3
8.
Spacers x 4
9.
Screws x 4
10. Bracket screws x 2
11. Temp.sensor (Combi Pure)
12. Screw B4x6,5 (x 1 Combi Pure, x 2 Combi Elite)
13. Sensor cover (Combi Pure)
14. Clips TC (3-5) x 10 pieces
15. Plastic plugs 25x5 x 2 pcs
16. Screws B6x25 x 2 pcs
17. Humidity- and temperature sensor (Combi Elite)
18. Cable between heater and humidity- and temperature sensor,
RJ10 4P4C, cable length 4 m x 1 pce (Combi Elite)
19. Control panel (Elite or Pure)
20. Cable between heater and control panel, RJ10 4P4C, cable
length 5 m x 1 pce
21. Cable tie
22. Clips C3x5 x 10 pieces
23. Modular plug 4, 4/4RJ10 x 2
24. Plastic plugs 25x5 x 3 pcs
25. Screws B6x25 x 3 pcs
26. Protection hose Ø14x150 mm x 3 pcs, for RJ10 cables (sensor,
control panel, door switch)
27. Door contact (Combi Elite)
Contact your dealer if anything is missing.
Control panel Pure is supplied with Sense Combi Pure.
Control panel Elite is supplied with Sense Combi Elite.
See separate guides.
12
11
13
16
15
14
18
17
19
Pure
20
Elite
21
25
22
24
23
26
27
Installation requirements
To ensure safe use of the heater, check that the following criteria
are met:
Cable (EKK) or electrical ducting (Fk) for connecting the hea-
ter must be run on the outside of the heat insulation.
The cables must be run correctly (see the Connection/wiring
diagram section, Figure 17).
The fuse size (A) and the power cable size (mm²) must be
suitable for the heater (see the Connection/wiring diagram
section, Figure 17).
The sauna ventilation must comply with the instructions in
this manual (see the Air intake valve positioning section,
page 13, the Air exhaust valve positioning section, page 13).
The position of the sauna heater, control panel and sensors
must comply with the instructions in this manual.
The heater's output (kW) must be adapted to the sauna's
volume (m³) (see Table 1). The minimum and maximum volu-
mes must not be exceeded.
NOTE! A brick wall without heat insulation increases
the warm-up time. Each square meter of plastered
ceiling or wall surface equals an additional 1.2–2 m³
of sauna volume.
Table 1: Output and sauna volume
Output kW
6,6
8
10,5
DANGER! Poor ventilation or heater positioning
may lead to dry distillation, posing a fi re risk
under certain circumstances!
DANGER! Insuffi cient insulation of the sauna
cabin may pose a fi re risk!
DANGER! Use of the wrong materials in the
sauna cabin, such as particle board, drywall, etc.,
may pose a fi re risk!
DANGER! The heater must be connected by a
qualifi ed electrician pursuant to applicable regu-
lations!
Installation tools
The following tools and materials are needed for installation and
connection:
water level,
adjustable spanner,
electric drill,
screwdrivers.
Installation planning
Before starting to install your sauna heater:
Plan the sauna heater positioning (see the Heater positioning
- normal installation section, page 12).
Plan the control panel positioning (see the attached instruc-
tions for the control panel for allowable positioning). See also
the Control Panel section on page 13.
Plan the sensor positioning (see Figure 3 and Figure 5).
Position the air intake vent (see the Air intake vent positioning
section, page 13).
Position the air exhaust vent (see the Air exhaust vent positi-
oning section, page 13).
Plan the electrical installation (see the Connection/wiring
diagram section, Figure 17).
Sauna volume min./max. m³
4-8
6-12
10-18
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sense combi elite

Table des Matières