Phoenix Mecano RK Rose+Krieger RKMultiControl duo Notice D'assemblage page 67

Commandes synchrones pour vérins électriques
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.6.3 Activation of the load resistor (only with RKMultiControl quadro):
In order to interoperate the controllers, you must set up and activate the load resistors for the first
and last RKMultiControl quadro controllers.
Example: You want to set up the load resistors for three interconnected controllers.
Configuring the load resistor on the first controller
Ensure that the hand switch is plugged into the socket of the first controller.
Press the F key until "P---" or "ParA" appears in the display. If "P---" appears in the display,
continue with step 3. If "ParA" appears in the display, use the hand switch keypad to enter
the access code 13121. The display changes to "P---".
Use the hand switch keypad to enter the code 233.
Use the UP and DOWN
Press the F key to quit setup.
Configuring the load resistor on the third controller
Press the F key until "P---" or "ParA" appears in the display. If "P---" appears in the display,
continue with step 3. If "ParA" appears in the display, use the hand switch keypad to enter
the access code 13121. The display changes to "P---".
Use the hand switch keypad to enter the code 233.
Use the UP and DOWN
Press the F key to quit setup.
Set up the controllers (Master/Slave).
Detailed information on configuring the controller is in section 7.7.
Ensure that the load resistor for the second controller is set to "0". If you activate
more load resistors than those for the first and last controllers, you can damage the
controllers!
/
keys to set the value "1".
/
keys to set the value "1".
7. Working life
67

Publicité

Table des Matières
loading

Table des Matières