3.5.2 Checking the motion
!
Warning
• When the mounting is completed, neutralize the hydraulic lock
(if present in the operators) by turning the correct key through
180° counter-clockwise, and move the gate-leaves manually
to check on the smoothness of the movement; this should be
done very slowly, otherwise the operators will take in air and,
consequently, will have to be bled.
• Open and close the gate leaf to check that the operator can
move freely without rubbing and without going against either
the gate leaf or the gate post.
• After making the checks, reset the hydraulic lock by turning
the release key fully in a clockwise direction.
3.5.3 Electrical connection
Make the electrical connection according to the wiring diagram (D1)
- see paragraph "System electrical connection".
Connect the supplied capacitor (B4 pos. 12) to the electric control unit
according to the wiring diagram of the unit itself.
3.5.4 Fitting the protection casing and removing
the bleed screw
Fit the protective casing (E1 pos. 1) to rod and insert into the
operator.
Hold the casing bottom (E2 pos. 2) in position with a cross-head
screwdriver (E2 pos. 3).
Fit the push-on cover (E3 pos. 2) on to the protective casing (E3
pos.1).
Tighten the fixing screw of the protective casing (E4 pos.1).
On completion of the assembly, remove the bleed screw (E5 pos. 4)
using a CH7 hexagonal wrench.
E1
E2
E3
1
2
E4
1