general information
EN
1.2
installation overview
11
5
3
6
12
9
4
7
8
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Plan out appliance enclosure, framing, fronts, accessories, etc.
3. Install rough framing (see "rough framing" section).
4. Place the appliance in its fi nal position.
5. Install nailing tabs (see "nailing tab installation" section).
6. Install appliance venting (see "venting installation" section).
7. Install vent shield (see "vent shield installation" section).
8. Install all electrical wirings (see "electrical information" section).
9. Install gas lines (see "gas installation" section).
10. Test appliance.
11. Complete framing (see "fi nish framing" section).
12. Finishing (see "fi nishing" section).
13. Complete installation checklist in the owner's manual and apply the serial number to the owner's manual.
7
W415-2033 / B / 02.04.20