fi nish framing - after appliance installation
EN
see-thru double built out
note:
Shaded components (fi nish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its fi nal position and venting
connected.
Drywall
minimum framing
Ref
E
N* / **
O*
P*
* Finishing material must be considered with the protrusion (i.e. P includes
framing and fi nish material). If desired, side and bottom protrusions can be
done with 4" (10.1cm) Max.
** This is a recommended minimum dimension when mounting heat-sensitive
objects above the appliance (see "fi nishing" and "minimum combustible mantel
clearances" sections, particularly when mounting electronic objects). Otherwise,
the built out section can be as minimal as desired.
46
W415-2033 / B / 02.04.20
N*
O*
Insulation
L38
16 3/16" (41.1cm)
14 1/4" (36.2cm)
25 11/16 (65.2cm)
4" (10.1cm) Max
Ceiling
E
L50
16 3/16" (41.1cm)
14 1/4" (36.2cm)
25 11/16 (65.2cm)
4" (10.1cm) Max
P*
note:
The L series requires a minimum en-
closure height of 73" measured from
the bottom of the appliance. For tem-
perature requirements, this area must
be left unobstructed. Some venting
confi gurations that require more verti-
cal rise will require a larger enclosure
to provide minimum vertical clearance
between vent pipes and combus-
tibles. It is also recommended that the
enclosure be ventilated at the top and
bottom to circulate the hot air.