Güde GRP-6501 B&S Traduction Du Mode D'emploi D'origine page 26

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
7.1
Inspections and Maintenance
V-belt
On new machines and the V-belt installation, the tension of it should be checked on after initial 5
hours of operation (see the maintenance schedule)
Fig. 7
B&S Engine
Any inspections and maintenance of the engine to be found in the Briggs- and Stratton manual!
7.2
Inspections and Maintenance Safety Instructions
Turn the engine off before repairs, maintenance and leaving the vibrator .
A
B
B
1
If the V-belt is to be tightened
or loosen, proceed according
to (Fig.7): Loosen screw A
first. Now, the engine may be
moved by
tightening/loosening screw B
thus the V-belt may be
loosened or stretched.
GB

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

55478

Table des Matières