Standards, regulations and directives
Observe all national, state, and local code, regulations
and standards applicable to installation and operation of
the tank!
All electrical components must be approved for the USA
and Canada.
4
Moving the tank
WARNING: Risk of injury from carrying heavy loads and
inadequately securing loads for transport!
▶ Use suitable means of transportation, e.g. a dolly with
strap.
▶ Secure the load against falling.
Where possible, do not remove the tank from its
packaging until it has reached the installation location.
This ensures protection during handling.
▶ Position the dolly at the back of the packed tank.
▶ Secure the tank to the means of transportation with a strap.
▶ Transport the tank to the installation location.
▶ Only remove the tank from the packaging at the installation location.
Fig. 5 Transporting with a dolly
S 32/5 – 6 720 804 007 (2013/02)
5
The tank is delivered fully assembled.
▶ Check that the tank is complete and undamaged.
5.1
5.1.1 Requirements for installation location
▶ Place the tank on a raised platform if there is a risk that water may
collect at the installation site.
▶ The installation site must be a dry and frost-free room.
▶ Observe the minimum room height ( Tab. 6, page 8) in the
installation room. No minimum wall clearance required.
▶ Maintain a distance of 2" (51 mm) from heated pipes and combustible
surfaces.
6 720 800 035-03.1ITL
Standards, regulations and directives
Installation
Boiler installation
NOTICE: Risk of damage from inadequate load-bearing
capacity of the supporting substructure or unsuitable
floor surface!
▶ Ensure that the installation area is level and offers
sufficient load-bearing capacity.
NOTICE: Risk of damage from stress cracking and
corrosion!
▶ Position the tank in a dry room free from the risk of
freezing.
▶ Install the tank only in closed-loop, unvented hydronic
heating systems.
▶ Open expansion vessels may NOT be used with this
tank.
NOTICE: Install an adequate drain pan if required by
code, or if a leak could result in property damage. Follow
drain pan manufacturer's instructions.
At least 19" (480 mm) clearance needed above the tank
for magnesium anode removal.