5
Installation
5.1.2 Positioning the tank
▶ Unpack the tank by removing the wrap, wooden boards and foam pad
on the top.
▶ Lay the foam pad on the floor to serve as a mat.
Fig. 6 Unpacking the tank
▶ Carefully lay the tank on the foam pad ( Fig. 7, [1]).
▶ Cut out the projections in the foam bottom ( Fig. 7, [2]).
10
▶ Unscrew the screw-in feet [3].
1.
2.
Fig. 7 Laying the tank on its side and exposing the adjustable feet
▶ Position the tank on a level floor that has adequate load-bearing
capacity ( Fig. 8).
6 720 800 035-04.1ITL
Fig. 8 Positioning the tank
▶ With the aid of the adjustable feet, align the tank vertically ( Fig. 8).
▶ Remove the protective caps from the connections.
▶ Use Teflon tape or Teflon cord to seal the connections. Do not use
hemp to seal the connections.
3.
6 720 801 769-15.1ITL
6 720 801 769-13.1ITL
S 32/5 – 6 720 804 007 (2013/02)