18
5.0 FINISHING
EN
HEAT VENTS AND AIR OPENINGS CANNOT BE COVERED IN ANY CIRCUMSTANCES.
5.1
BRICK PANEL INSTALLATION AND REMOVAL
A.
B.
C.
W415-2165 / E / 02.23.17
POWER SUPPLY SERVICE MUST BE COMPLETED PRIOR TO FINISHING TO AVOID
Slide the panels into place and secure it using the 2 screws provided (#6 x 3/8").
Ensure the brick panels are positioned properly in the unit and are not angled or sticking out
from the unit.
To remove the panels, remove the 2 screws.
2 SCREW LOCATIONS
WARNING
!
RECONSTRUCTION.