Installation Of Refractory Walls - Palazzetti Isabel 9 US Manuel D'installation, D'utilisation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.4 Installation of refractory walls

The components are: a left side support (A), a right
side support (B), a left refractory wall (C), a base
one (D) and a right one (E).
C
A
To insert the components inside the combustion
chamber, proceed as follows:
Open the door (D), remove the burn pot (E)
and remove the ash drawer (F - Fig. 24).
D
E
F
004778680 - 25/02/2021
D
E
B
Fig. 23
Fig. 24
ITALIANO
• Remove the fixing bracket (G) by loosening the
screws (H - Fig. 25).
H
Position the two side supports (A e B) being
sure to insert the two blades in the rear of the
supports in the appropriate slots (I) created
inside the combustion chamber (Fig. 26).
A
• Place the left refractory wall (C) in the combus-
tion chamber, inserting the lower part of the wall
itself in the appropriate housing on the support
(A - Fig. 27).
ENGLISH
FRANÇAIS
G
Fig. 25
B
I
Fig. 26
67

Publicité

Table des Matières
loading

Table des Matières