Palazzetti Isabel 9 US Manuel D'installation, D'utilisation Et De Maintenance page 68

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

A
G
• Bring the back wall (D) and the right wall (E)
closer together, aligning the relevant grooves
(Fig. 28).
D
68
2
1
Fig. 27
E
E
D
Fig. 28
• Place the two refractories (D and E) inside the
combustion chamber making sure that:
- the back wall (D) fits into the side profile of
the left wall previously fitted (Fig. 29);
- the lower part of the right wall (E) is positioned
on the support (B - Fig. 30).
D
E
• Reposition the ash drawer and the burn pot.
2
E
1
Fig. 29
B
Fig. 30
004778680 - 25/02/2021

Publicité

Table des Matières
loading

Table des Matières