Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Mounting

GB 12
• Mark the drill holes.
• Install the flange and place the electrical unit upright.
• Then screw the hood to the wall using the plugs and screws.
• Fix the mounting bracket of the upper duct to the wall against the
ceiling.
• Connect the waste pipe and then insert the plug into the electrical
unit.
• Put the plug in the wall socket. Ensure that there is no tension on
the wall socket!
• Slide the upper duct into the lower duct.
• Let the ducts drop into the hood.
• Push the upper duct around the wall bracket and screw the wall
bracket on to the mounting bracket with the screws supplied.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Msk930

Table des Matières