Connecting Control Voltage Cables - Vetus BOW PRO A Série Instructions D'utilisation

Masquer les pouces Voir aussi pour BOW PRO A Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
5 .6

Connecting control voltage cables

• Mount the control panel at the helm position. There must be 150
mm of free space behind the panel.
• Connect the panel as shown in the dia-
gram.
See diagrams on page 165 if several pan-
els have to be connected.
• Connect the hub to a 12-Volt power sup-
ply.
n
ote
The hub should also be connected to
12 Volts in the case of a 48-Volt bow
thruster .
7
+
12 V
3
The CAN bus is a chain to which the bow thruster and the panels are
connected.
32
020806.03
Control panel
48 V
12 V
Control voltage fuse
M
+
12 V
3
n
ote
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0651, BOWA0761 and BOWA0764
Terminator
Connection cable
Hub
+
M
7
At one end of the chain, the power supply (3) must be connected
and the terminator (7) must be connected at the other end!
- BPPJA
- BPPPA
Connection box thruster
Connection cable
CAN-bus supply
7
+
12 V
3
M

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bowa0651Bowa0761Bowa0764

Table des Matières