Specifications For Grid Protection - SMA SUNNY HIGHPOWER PEAK1 Instructions D'installation

Masquer les pouces Voir aussi pour SUNNY HIGHPOWER PEAK1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5 Technical Data
Torques STP 60-10
Parameters
A
M63 cable gland
Swivel nut of the M63 cable gland
B
AC terminals
C
Primary grounding conductor
(secondary grounding conductor
directly to the right of it)
D
PV terminals
E
M32 cable gland
Swivel nut of the M32 cable gland
F
M25 cable gland
Swivel nut of the M25 cable gland
G
M6 equipment grounding
(equipotential bonding terminal)
Front screw (not shown)
Table 5.8: Torques STP 60-10
5.5 Specifications for Grid
Protection
Parameters
Maximum inverter current, I
Recommended type of time-lag fuse gL/gG (IEC 60269-1)
Recommended circuit breaker type B or C
Maximum fuse rating
Table 5.9: Specifications for grid protection
INFORMATION
Observe local regulations.
46
SHP75-10-STP60-10-IA-xx-18
Tools
Wrench 65/68 mm 6 Nm
Wrench 65/68 mm 3 Nm
TX 30 x 50
TX 30
TX 30 x 50
Wrench 36 mm
Wrench 36 mm
Wrench 33 mm
Wrench 33 mm
TX 20
TX 30
ACmax
Torque
14 Nm (cable sheath diameter = 35 to 95 mm);
3.9 Nm
14 Nm (cable sheath diameter = 35 to 95 mm);
6 Nm
1.8 Nm
10 Nm
1.8 Nm
3.9 Nm
1.5 Nm
SHP 75-10
109 A
160 A
160 A
160 A
SMA Solar Technology AG
STP 60-10
87 A
125 A
125 A
125 A
Installation Guide

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sunny tripower 60

Table des Matières