2.7 Enclosure opening

The mounting brackets for the cable glands are already
pre-mounted.
Figure 2.19 AC cable gland
Terminal
SHP 75-10
AC+PE
PV
STP 60-10
AC+PE
PV
Table 2.1 Suitable conductor sizes
1)
Always observe the ampacity of cables used.

2.8 Ethernet Connections

When used outdoors, make sure to use a suitable cable (see
Section 5.6 "Technical Data of the Communication
Interface", page 47). If the cable is very stiff, an
intermediate terminal should be used to achieve greater
flexibility of the cable before it is connected to the inverter.
For some cables, it may be sufficient to remove the outer
hard sheath from the part of the cable that is inserted into
the inverter enclosure. In this way, the RJ45 Ethernet
connectors mounted on the printed circuit boards are
protected against excessive stress, which could lead to
damages or problems with the connection.
Procedure:
1. Do not remove the RJ45 connector on the Ethernet
cable.
2. Run the cables through the base of the inverter via
cable glands. See figure 2.20.
3. Cut slice in rubber grommet. Place the grommet in the
gland to ensure proper seal.
Installation Guide
1)
Range
Line material
35 to 150 mm²
Al/Cu
35 to 150 mm²
Al/Cu
16 to 95 mm²
Al/Cu
16 to 95 mm²
Al/Cu
Figure 2.20 DC cable gland
Cable sheath diameter with
supplied cable gland
46 to 53 mm
18 to 25 mm
37 to 44 mm
14 to 21 mm
4. Plug into the Ethernet connector.
Figure 2.21 Run cables through cable glands
SHP75-10-STP60-10-IA-xx-18