3 Initial Setup and Start

Cable requirements STP 60-10
Figure 2.25 DC label STP 60-10
Protection class of PV modules
The inverter must only be operated with PV modules of
protection class II, compliant with IEC 61730, application
class A.
Only connect PV modules to the inverter. Other energy
sources are not allowed.
PV modules generate a voltage when exposed to light.

2.10 Closing

1. Close the cover of the inverter installation area. Fasten
the three front screws (see Section 5.4, page 45).
2. Turn on AC power.
3 Initial Setup and Start

3.1 User Interface

The user interface comprises:
• Local display, for all inverter variants. The local display
shows status information of the inverter. It is not
possible to set up or configure the inverter via the
display. The "#" in the display explains the operation
modes.
• Local commissioning and service tool (LCS-Tool). The
LCS-Tool can be used for configuring one or more
inverters.
30
SHP75-10-STP60-10-IA-xx-18

3.1.1 Operating Modes

The inverter has five operation modes, indicated by LEDs.
Status
Off grid
Connecting
On grid
Internal inverter event
Fail safe
Table 3.1 Operating modes
Off grid (LEDs off)
#0-51
If no electric current has been fed into the AC grid for more
than approx. ten minutes, the inverter disconnects itself from
the utility grid and shuts down. User and communication
interfaces remain powered for communication purposes.
SMA Solar Technology AG
LEDs
LEDs
Green
Red
Green
Red
Green
Red
Green
Red
Green
Red
Installation Guide