Periodic Maintenance; Maintenance Schedule - Atlas Copco HiLight E2 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 75
5

Periodic maintenance

5.1

Maintenance schedule

Before carrying out any maintenance activity, check that the power switch is in position OFF and that no electrical power is present on the
terminals.
Maintenance schedule
For the most important sub-assemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Light tower
Check if mast cables are not frayed or damaged. Replace immediately if damaged.
Check support connection bolt of floodlights
Check adjustable plates condition
Check electrical cable condition and upper fixation clamp
Grease the mast collar (1)
Grease the mast adjustable plates (contact surface only) (1)
Inspection by specialized Service technician
Note:
(1) Atlas Copco grease 1636 3009 83.
- 28 -
Daily
Yearly
x
x
x
x
x
x
x

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hilight e3+Hilight esf

Table des Matières