Installation And Connection; Lifting; Positioning And Transport; Positioning For Operation - Atlas Copco HiLight E2 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 75
3
Installation and
connection
3.1

Lifting

The lifting eye (1), to lift the light tower by means of
a hoist, is integrated in the mast and easily accessible
from the outside.
1
While lifting, the light tower will be tilted towards the
mast to avoid damage to the floodlights.
Lifting acceleration and deceleration
must be kept within safe limits (max.
2 g).
Helicopter lifting is not allowed.
To be able to lift the light tower by means of a forklift,
forklift slots (2) are provided in the frame.
2
To lift the HiLight E2 and E3+ by
using the lifting eye, the flood lights
should be in operation position. To
lift the light tower by means of a fork
lift, the flood lights can be both in
operation or transport position. See
also
chapter
"Positioning
transport".
- 19 -
3.2

Positioning and transport

The operator is expected to apply all
relevant
including those mentioned on page
10 to page 14 of this booklet.
3.2.1

Positioning for operation

Follow the steps below to position the light tower:
2
1. Place the light tower on a horizontal, even and
solid floor.
2. Make sure that the mast is down.
3. To extend the stabilizers; release the locking pin
of each stabilizer (1) by lifting it up and pull the
supporting foot (2) at the maximum extension of
the stabilizer (3).
1
2
and
3
safety
precautions,
2
3
2
3
3
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hilight e3+Hilight esf

Table des Matières