4
Operating instructions
In your own interest, always strictly
observe
all
relevant
instructions.
Do not operate the light tower in
excess of the limitations mentioned
in the Technical Specifications.
Local rules concerning the setting
up of low voltage power installations
(below 1000 V) must be respected
when connecting site distribution
panels.
At each start-up protections (GB
trip) of the light tower must be
verified. Earthing must be done
either by the earth pin or, if
available, by an existing, suitable
earthing installation. The protective
system against excessive contact
voltage is not effective unless a
suitable earthing is made.
4.1
Before starting
– Perform all daily checks and maintenance as
specified in the "Maintenance schedule" on page
safety
28.
– Check the tightness of all bolts and nuts. For
torque
values,
connections" on page 38.
– Check that circuit breaker Q1 is switched off.
– Check that the fuses have not tripped.
– Check that the load is switched off.
see
chapter
"Critical
bolt
- 25 -
4.2
Operating the light tower
4.2.1
Positioning the floodlights
1. Check that the glass panes of the lights (1) are in
good condition.
2
2. Check the tightness of the nuts on top of the light
supports (2). Torque if necessary.
1