Atlas Copco HiLight E2 Manuel D'instructions page 20

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 75
4. Once the stabilizers (3) have been extended,
release the locking pin (1) to lock them in
position.
5. Turn the handle (4) at the top of the supporting
feet anticlockwise to lower them and put the light
tower in a level position.
4
Adjust the height of the supporting
feet gradually in order to ensure the
stability of the unit.
Check the levels (5) on top of the
light tower to ensure that the unit is
in a level position.
5
- 20 -
6. Rotate the floodlight support 90º (operation
position) by loosening the 4 screws on top (6).
When the support is correctly positioned, tighten
the 4 screws again.
6
For more detailed installation instructions, see also
chapter "Installation" on page 23.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hilight e3+Hilight esf

Table des Matières