Installing Landing Gear - PARKZONE Stinson Reliant SR-10 BNF Manuel D'utilisation

Masquer les pouces Voir aussi pour Stinson Reliant SR-10 BNF:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN

Installing Landing Gear

1.
Turn over aircraft to install landing gear on the bottom of
the aircraft.
2.
Put left landing gear tab (marked with "L") in the slot in the
left fairing on the bottom of the aircraft.
3.
Lift the landing gear tab near the three (3) holes in the
fairing and install three (3) screws in the holes in the tab.
4.
Align, turn and tighten the screws in the holes in the
bottom of the aircraft.
8
5.
Install right (marked with "R") landing gear using the steps
above.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Stinson reliant sr-10 pnp

Table des Matières