Installing Landing Gear - PARKZONE Extra 300 PNP Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

En

Installing Landing Gear

Note: Fairings (PKZ5130) may be removed for flying the
Extra 300 from a rough runway
1. Press together landing gear (PKZ5106) legs and put
landing gear support in slot in bottom of fuselage (painted
bare fuselage, PKZ5167).
2. Release landing gear when support is fully installed in
the fuselage slot.
7
3. Install left (marked "L") and right (marked "R") landing
gear fairings on the landing gear supports and fuselage
using four (4) small screws.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Extra 300 bnf

Table des Matières