Télécharger Imprimer la page

Emerson AVENTICS CO1 Notice D'instruction page 16

Bobine magnétique avec connecteur
Masquer les pouces Voir aussi pour AVENTICS CO1:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
2. Slide the solenoid coil onto the armature guide tube of the base valve. The coil
can be adjusted in 45° staggered increments and must be completely en-
gaged.
3. Tighten the solenoid coil back onto the armature guide tube of the base valve.
Tightening torques:
- Metal nut: 0.8 ± 0.12 Nm
- Plastic nut (open): 0.5 ± 0.075 Nm
- Plastic nut (closed with sealing edge): 1.3 ± 0.1 Nm
6.3.2 Connect the solenoid coil
Remove electrical connector
1. Loosen the center screw (see g Fig. 1: 3) on the electrical connector (1) and
remove the electrical connector from the solenoid coil (10).
2. Carefully remove the center screw (3) and seal (2) without damaging the seal
(9).
CAUTION! Cable sealing ring and seal must not be damaged. Liquids and for-
eign objects could penetrate and destroy the device when incorrectly disas-
sembled.
3. Raise the electrical connector insert (8) out of the electrical connector (1) by
inserting a screwdriver into the recess (11).
4. Loosen the cable guide screw (6) and remove the thrust ring (5) and cable
sealing ring (4) without damaging it.
Connect the cable
1. Assemble the cable guide in the order to be followed: Push the cable guide
screw (6), the thrust ring (5), the cable sealing ring (4) and the electrical con-
nector (1) onto the cable. In particular, take the orientation of the thrust ring
(5) into account.
2. The connection terminals (7) are designed with a sleeve terminal design. Con-
nect the individual wires to the connection terminal as shown in the wiring di-
agram. Use wire end ferrules.
Tightening torque: 0.2 ± 0.1 Nm
Assemble electrical connector
1. The electrical connector insert (8) can be mounted in 90° increments depend-
ing on its application. Reinsert the electrical connector insert into the electri-
cal connector (1) until it engages.
2. Screw the cable guide screw (6) back onto the electrical connector without
damaging the cable sealing ring (4).
Tightening torque: 1.8 ± 0.2 Nm
3. Place the center screw (3) and seal (2) carefully into the electrical connector.
Install the electrical connector
1. Place the assembled electrical connector onto the three contacts of the sole-
noid coil (10).
2. Make sure that the seal (9) is lying smoothly between the solenoid coil and
electrical connector.
3. Tighten the center screw (3) with a hex key (SW2) in the electrical connector.
Tightening torque: 0.4 ± 0.1 Nm
7 Commissioning
Follow the steps below to carry out commissioning.
7.1 Basic requirements
Personnel qualifications
Commissioning only by qualified personnel (see section g 2.5. Personnel qualifi-
cations).
Limits
• Comply with the limits (explosion protection, material protection). Limits: see
section g 13. Technical data.
7.2 Notes on safety
To eliminate risks during commissioning, observe the notes on safety: see section
g 2.6.1. Notes on safety.
AVENTICS™ CO1 | R499050034-BAL-001-AI | English
7.3 Preparation
General requirements
• Make sure that no dirt or other foreign particles come into contact with the
electrical connector components or the seal of the device (material protec-
tion).
Specifications for use in explosive areas
• Make sure that the seals are integrated in the plug and not damaged (explo-
sion protection).
• Make sure that all plugs are mounted (explosion protection).
7.4 Step-by-step commissioning
If you have carried out and completed all preparation work, you can commission
the system.
8 Operation
8.1 Basic requirements
The following points must be observed during operation.
General requirements
• Do not touch the product or any connected parts during operation (accident
prevention).
• Never switch off, modify or bypass safety devices.
Limits
• Comply with the limits (explosion protection, material protection). Limits: see
section g 13. Technical data.
• Make sure that the product is only used in normal industrial settings (explo-
sion protection).
• Make sure that there are no ferromagnetic sources near the product (material
protection).
Service
• Carry out service work in the designated time intervals: see section g 9. Ser-
vice.
In case of malfunctions during operation
• In case of a malfunction that presents an immediate danger for employees or
systems: Switch off product.
• Carry out analysis and troubleshooting of malfunctions according to the fol-
lowing specifications: see section g 12. Troubleshooting.
• If a malfunction cannot be remedied: Inform the customer service. Contact
data: see back cover.
9 Service
The following operation-related activities are necessary to ensure safe use of the
product with minimal wear and tear:
• Inspection, see section g 9.2. Inspection
• Cleaning, see section g 9.3. Cleaning
• Maintenance, see section g 9.4. Maintenance
9.1 Notes on safety
To eliminate risks during service, observe the notes on safety: see section
g 2.6.1. Notes on safety.
9.2 Inspection
During inspection, check the product for damage and contamination at regular
intervals.
9.2.1 General requirements
Use in normal ambient conditions
• Inspection interval: The product must be checked monthly.
16

Publicité

loading