Télécharger Imprimer la page

Pentair Sta-Rite S20P4JP10221 Notice D'installation Et De Fonctionnement page 3

Publicité

Pre-Installation
Pre-Installation
Report any damage immediately to the shipping
carrier or to your dealer.
The well driller should thoroughly develop the well
(that is, pump out all fine sand and foreign matter)
before pump is installed.
Pump performance is based on pumping clear,
Warranty is void in the following conditions:
excessive sand can cause premature wear
to pump.
being pumped – these can reduce flow and
cause cavitation which can damage pump.
valve closed – severe internal damage
will result.
the lowest water level reached with pump running
(lowest draw-down water level), and at least 5'
See Tables for information on submersible motor
overload protection, control box specifications,
recommended fusing, and service wiring
Diagrams for typical
submersible pump installation wiring.
Wiring/Grounding
Hazardous voltage. Can shock, burn,
or cause death. Permanently ground pump, motor
and control box before connecting power supply
to motor.
least as large as wires carrying current to motor.
Splice this ground wire to a copper conductor that
matches motor wire size specified in Cable Sizing
Tables. Also see Cable Splicing instructions.
Permanently ground pump, motor and control box
before connecting power cable to power supply.
Connect ground wire to approved ground first and
ground to a gas supply line.
Fire and electrical shock hazard.
pump and control box, run drop cable to a
separate junction box. Connect junction box to
For more information, contact your local
code authority.
Wiring Connections
Electrical Code, Canadian Electrical Code and
local codes for all wiring (as applicable).
pump and control box.
To avoid over-heating wire and excessive voltage
drop at motor, be sure that wire size is at least as
large as size listed in cable sizing tables for your
horsepower pump and length of wire run.
NOTICE See Diagrams for typical wiring hookups
and control box identification.
NOTICE When built-in overheating protection
is not provided, install an approved overload
input in full load amps. Select or adjust overload
element(s) in accordance with control instructions.
When built-in overheating protection is provided,
use an approved motor control that matches motor
input in full load amperes.
Rotation – (3 Phase only)
To make sure motor is running in the correct
direction, proceed carefully as follows:
After electrical connections have been made
as outlined, and with pump hanging in well
supported from clamp on the discharge pipe, turn
on then turn off the switch connecting the motor to
the power supply line.
connections are properly made, pump will "jerk"
clockwise when looking into the pump discharge
the motor is running in the wrong direction.
connect to the "lead" terminals in the magnetic
starter. With connections properly made, and pump
the pump should deliver water according to the
performance charts.
Overload Protection Of Three
Phase Submersible Motors –
Class 10 Protection Required
The characteristics of submersible motors are
different from standard motors and special
All recommended overload selections are of the
ambient compensated type to maintain protection
at high and low air temperatures.
All heaters and amp settings shown are based on
total line amps. When a six-lead motor is used
with a Wye-Delta starter, divide motor amps by
heaters carrying phase amps.
3

Publicité

loading