Turning The Ups Off; Initiating The Battery Test - Eaton Powerware 9125 Guide D'installation

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

OPERATION

Turning the UPS Off

NOTE Pressing the Off
down immediately.
To turn off the UPS:
1.
2.
3.

Initiating the Battery Test

NOTE The batteries must be fully charged and the UPS must not be in Battery mode to
perform the battery test.
NOTE For an accurate battery test, test the UPS with at least 50% load applied to the UPS.
The UPS automatically performs a battery test every 30 days. If the UPS
transfers to Battery mode, the UPS resets the timer.
To initiate a battery test, press and hold the
seconds. The UPS cycles the bar graph indicators twice, verifies the
battery converter, and schedules the battery test to occur within
24 hours.
36
EATON Powerware
button while the UPS is in Battery mode causes the UPS to shut
Prepare your equipment for shutdown.
Press and hold the Off
μ
The
indicator begins to flash. The UPS transfers to Standby
mode (if utility power is available) and removes power from your
equipment.
Unplug or remove utility power from the UPS; the UPS shuts down
in five seconds. The bar graph and battery indicators flash briefly
prior to shutdown.
If you do not unplug or remove utility power from the UPS, it
remains in Standby mode.
®
9125 (9910-P64) UPS Installation Guide for IBM
button for approximately three seconds.
button for three
®
S
Applications
164201637 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p64Powerware 39j4817Powerware 103003635-3991

Table des Matières