Eaton Powerware 9125 Guide D'installation page 39

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

8.
UPS Only: The UPS automatically sets the output voltage based on
the input voltage. To change the output voltage, see
"Configuration" in the UPS user's guide.
UPS with PDM: Confirm the UPS output voltage through the front
panel and verify that it matches the PDM output voltage (see
"Configuration" in the PDM user's guide).
Failure to match the UPS voltage may result in a hazardous condition, including damage to
the UPS or to the load.
9.
UPS with PDM: Switch the PDM output circuit breaker to the ON (
position.
NOTE The PDM output circuit breaker (disconnect switch) disconnects power to all of the
output receptacles on the PDM rear panel, but does NOT shut off power to the UPS (opening
the upstream protection would be required).
10. UPS with PDM: Install the PDM front cover.
If you have questions about implementing non- or dual-redundant power,
the following options are available:
S
www.oem.powerware.com/ibm-ups/pdf/nemadiagm.pdf or
www.oem.powerware.com/ibm-ups/pdf/iecdiagm.pdf
S
Submit your question to "Ask the Expert" at
www.oem.powerware.com/ibm-ups/
S
Submit your question to our FAQ database at
www.oem.powerware.com/IBM_faq/afmmain.asp
S
Contact the IBM office or Business Partner servicing your account
®
EATON Powerware
9125 (9910-P64) UPS Installation Guide for IBM
C A U T I O N
®
S
Applications
164201637 Rev A
INSTALLATION
|
)
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p64Powerware 39j4817Powerware 103003635-3991

Table des Matières