Tower Setup - Eaton Powerware 9125 Guide D'installation

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

Tower Setup

The UPS and any optional cabinets (PDM or EBM) must be stabilized
with pedestals or joining brackets. The setup varies depending on the
number of cabinets you are installing:
1.
2.
3.
4.
12
EATON Powerware
For one cabinet, both sets of pedestals must be installed (provided in
the P64 accessory kit). Complete Steps 2 through 4.
For two or more cabinets, the pedestals are not installed. Skip to
Step 5 to install the joining brackets.
Place the UPS horizontally, so that the left end of the cabinet is
accessible (see Figure 12).
Align the UPS pedestals over the holes on the end of the UPS as
shown in Figure 12. Secure the pedestals with the supplied screws.
Figure 12. Installing the UPS Pedestals
Carefully position the cabinet upright (see Figure 13).
Continue to "Power Connections and Startup" on page 21.
®
9125 (9910-P64) UPS Installation Guide for IBM
®
S
Applications
164201637 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p64Powerware 39j4817Powerware 103003635-3991

Table des Matières