Eaton Powerware 9125 Guide D'installation page 19

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

To install the rail kit(s):
NOTE All hardware (screws, clip nuts, etc.) referenced in Steps 2 through 4 are contained
in the rail hardware kit.
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 1).
Front
Rail Assembly
2.
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
The first rail should be placed at the bottom, using positions 1 and 6
for the front hex-head screws. If you are installing additional rails,
the next rail should be placed 4 holes above the last installed screw
(see Figure 2).
®
EATON Powerware
9125 (9910-P64) UPS Installation Guide for IBM
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
®
S
Applications
164201637 Rev A
INSTALLATION
Rear
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p64Powerware 39j4817Powerware 103003635-3991

Table des Matières