EN
1. PLEASE READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE ASSEMBLING YOUR GREENHOUSE.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
3. The product you have purchased is intended only for growing plants and should only be used for this purpose. When used for other purposes we will take
no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. When using a step ladder one person should steady it at all times whilst the other works.
6. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
7. The greenhouse must always be anchored.
SITE SELECTION
Always try to select a sunny location, sheltered
from the wind as much as possible.
IMPORTANT
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
Note - The UV-resistant side of the
polycarbonate panes is indicated by a plastic
film or printing at the edge. This side must
face outside.
In order to seal the greenhouse effectively it is
suggested that you apply neutral silicone as
shown in diagrams (4b.7), (4b.8), (7a.6) and
(7a.8). Silicone is provided for this purpose.
NECESSARY TOOLS
Screw drivers (Normal and Crosshead PH2)
Rubber Hammer
2 x 1.8m ladder
10 mm socket spanner or wrench
10 mm combination spanner
Craft knife
Measuring stick
Spirit level
Accu-drill with adjustable torque
MAINTENANCE
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or plastic.
Ensure that the door tracks are cleaned
6
Safety Warning
Assembly Instructions
regularly to avoid a build-up of debris.
0. FOUNDATION
Important! The foundation must be exactly
right angular and level. To achieve this you will
require a spirit level and a right angle.
Note - If the distance between the two
opposite corners is the same then the
foundation is right angular.
For the erection of this greenhouse we
suggest a solid foundation constructed from
concrete, brickwork or stonework.
If you have no experience with the
construction of such a foundation please
consult a company specialising in this work.
Materials and tools for the preparation of the
suggested foundation are not provided.
The suggested foundation allows the door to
be assembled in the front of the greenhouse.
The door can also be assembled on any other
side if required. Please then prepare the
210mm wide foundation on this side using
length C or D as reference.
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. Those
enclosed in a double frame show the view
from outside the greenhouse.
1. BACk ELEMENT
Note - If the door is to be assembled on this
side of the house remove one of the middle
bars (7311).
Push seal (7396) into the sill bar (7304 / 7306)
and cut to fit both ends (1.1) (1.2).
Lay all of the parts, according to the model, on
the floor and loosely connect by inserting bolts
(7052) into the bolt channels.
Take care that the eave angles (7314 / 7316)
are pushed into the corner of both corner bars
(7310) (1.3) (1.4) and that corner bars (7310)
and middle bars (7311) sit correctly on the
assembly edge on the eave angle (1.9) (1.12).
Assemble diagonal bars (7312) on both sides
(1.3) (1.4) (1.10) (1.11). At the sill loosely
attach using bolt (7050). (7050) will be
removed during glazing (section 7b).
2. PLAIN GABLE END L
Note - If the door is to be assembled on this
side of the house remove middle bar (7311).
Push seal (7396) into sill bar (7304) and cut to
fit the ends (2.1) (2.2).
Lay all of the parts on the floor and loosely
connect by inserting bolts (7052) into the bolt
channels.
Assemble end bar (7319) into the recess in
corner bar (7437) (2.3) (2.4) and then (7437)
onto sill bar (7304) (2.5) (2.6).
Assemble middle bars (7311) (2.7) (2.8).
Assemble diagonal bar (7312) (2.3) (2.4) (2.9)
(2.10). At the sill loosely attach using bolt
(7050). (7050) will be removed during glazing
(section 7b).
3. PLAIN GABLE END R
Note - If the door is to be assembled on this
side of the house remove middle bar (7311).
Assemble all parts as in Section 2.
4a. CONNECTING THE ELEMENTS
Push seal (7396) into the sill bar (7304 / 7306)
and cut to fit both ends (4a.1) (4a.2).
To connect the previously prepared sections,
loosely prepare bolts (7399) and nuts (7053)
in sill bars (7304) as shown in (4a.3). Lower
corner bars (7310) fitting the bolt heads of
(7052) into the bolt channels of (7310) (4a.4).
070.01.2007