SORHEA
4.2
Installation of MIRIS 3100 column
Wall mounting: see notice provided with brackets
Detail for floor socket
Seal the 4 anchor rods in solid concrete, taking carte to install them in a vertical position using the
provided sealing template.
Position the floor socket seal so that it is oriented the same way as the beams.
The fixing model holding the base assembly in place also serves as the sealing
template.
250 mm / 9.8 in
200 mm / 7.9 in
Mounting the column on the floor socket
4 anchors rods
M16x250
Oblong: 50x130 mm
125 mm
/ 4.9 in
1
Slide the braces
onto the floor
socket without
fastening them.
Effective zone of
beams: 90°
/ 2x5.1 in
- 36 -
MIRIS 3000 / 3100
Slide the column between
the two floor socket
2
mounts. Be careful to
leave space between the
bottom of the column and
the floor socket for the
cables.
Tighten the fastening
screws for the braces to
keep the column stable.