Water inlet pressure must be between 50 and 300 kPA, otherwise a pressure regulator
must be installed before the appliance.
-
A water tap is connected to the appliance.
-
The water connection must be in conformity with the Water Act 1086 - Model bylaws.
− The choice of the gas piping depends on the diameter required for the type of gas,
appliance and installation and should be performed in conformity with current
regulations.
− The gas feed plant can either be fixed or be disconnected; if flexible pipes are
employed they must be made from stainless material and not be affected by corrosion.
− If sealing materials are used for connections, they must be certified and approved for
the purpose.
− The gas fitting is located on the lower right side of the appliance
− Once the appliance has been connected, carry out a leakage test on all the fittings
connecting the appliance to the plant. It is advisable to use a leakage spray, otherwise
treat the parts with a foam that does not produce corrosion; no bubbles should
develop. Carry out the leakage test also on the rapid cut-off valve.
Warning! : Flames are strictly prohibited for leakage tests!
Instruction manual for installation, maintenance and use
GAS TILTING BRATT PANS Serie 900

2.2.2. CONNECTION TO WATERWORKS

2.2.3. GAS CONNECTION PROCEDURES

- GB -
11 di 36
Page

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

80brg80i90brg90i90brg15i90brg12i

Table des Matières