Mennekes AMTRON Manuel D'utilisation Et Guide D'installation page 63

Masquer les pouces Voir aussi pour AMTRON:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 111
Block 8: Energy meter
Parameters
Reset Meter Value Behaviour (S0
and internal meter)
Send signed meter values
Data transfer for Tariff And Total
Usage
Meter configuration (Second)
Block 9: Other
Parameters
HLC 15118 configuration
Use of SA Schedule in 15118
HLC
Extra HLC 15118 logging
Power source voltage
Phases connected to the
ChargePoint
Phase rotation of the
ChargePoint
Randomize charging after
power loss
Language of Display
UTC time for housekeeping
reboot
Vehicle connection timeout
Lock Actuator only if authorized
Permanently locked cable
Description
Reset of the energy meter at each
charging process
Setting that specifies whether infor-
mation concerning the tariff and
energy consumption should be dis-
played
Description
Enables communication to ISO 15118
Allows the forwarding of load profiles to the vehi-
cle which are set by the operator via the Smart
Charging Profile (Secondary Actor) to the charging
point
Activate recording of the input and output stream
of ISO 15118 communication. Logging is stored in
the hlc_log.csv file
Rated voltage between phase conductor and neu-
tral conductor
Number of phases connected on the device
Direction of rotation of the phases L1, L2 and L3
Random delay after power failure, to avoid peak
currents
Time for restart of the device
Time that is allowed to elapse between an authori-
sation and connection of the vehicle to the device,
in order to start a charging
Locking of the charging plug only after authorisa-
tion
Permanent locking of the charging plug
Necessary
for ...
Backend sys-
tem
Not relevant for the device
Backend sys-
tem
Not relevant for the device
Necessary
for ...
ISO 15118
Charging
system
Not relevant for the device
Charging
system
Remark
Information will be provided
by your Backend-System
operator
Remark
For version
Professional+
7,4 / 22 PnC only
Only relevant
for three-phase
operation
A restart will be
performed every
30 days
EN
25

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières