Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Building-in
1. Make a hole in the side of the kitchen
cabinet to enable the gas pipe to be passed
through.
2. Stick the sealing strip around the
opening (C) .
3. Place the appliance in the cut-out.
4. Secure the hob by tightening screw (B) to
secure clamp (A) (see below).
B
A
C
Min. 30
Max. 40

Publicité

Table des Matières
loading

Table des Matières