Important - Baxi LUNA HT 1.330 Notice D'installation Et D'entretien

Masquer les pouces Voir aussi pour LUNA HT 1.330:
Table des Matières

Publicité

1. Locate the fl ue elbow on the adaptor at the top of the boiler. Set the
elbow to the required orientation (rear, right or left).
2. Measure the distance from the outside wall face to the elbow (Fig. 2).
This dimension will be known as 'X'.
3. Taking the air duct, mark dimension 'X' as shown (Fig. 3). Measure
the length of waste material, and transfer the dimension to the fl ue duct
(Fig. 3).
4. Remove the waste from both ducts. Ensure that the cut ends are square
and free from burrs.
IMPORTANT: Check all measurements before cutting. Clearance to
combustible materials when using concentric system is zero.
Wall Thickness
Épaisseur du mur
(X)
Fig. 2
Fig. 3
1.Placer le coude d'évacuation des fumées sur l'adaptateur en haut de
la chaudière. Orienter le coude selon les besoins de l'installation (en
arrière, à droite ou à gauche).
2. Mesurer la distance entre le bord extérieur du mur et le coude (Fig.2).
Cette cote sera indiquée par la lettre 'X '.
3. En prenant le conduit d'air, marquer la cote 'X ' (voir Fig.3). Mesurer
la longueur de la chute et la transférer sur le conduit des fumées (Fig.3).
4. Couper les chutes des deux conduits en s'assurant que les coupes sont
bien à l'équerre et sans bavures.
IMPORTANT : Contrôler toutes les cotes avant de couper. La clairance
est zéro quand il est utilisé le conduit concentrique.
(X)
Wall Thickness
Épaisseur du mur
Waste
(X)
Chute
Air Duct
Conduit d'air
Waste
Chute
Flue Duct
Conduit des fumées
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Luna ht 330

Table des Matières