EN
ENGLISH
(WET
OR
GEL)
INSTALLATION AND CHARGING
The electrical board of the machine is to be set according to
the type of batteries installed, either gel (GEL) or lead (WET).
Proceed as follows:
Machine Setting
1.
The machine factory setting is for GEL batteries; if this
setting corresponds to the type of batteries bought, go to
step 5. Otherwise, carry out steps 2, 3, and 4 too.
2.
Remove the screws (A, Fig. 7) and carefully pull out the
electrical component box cover (B).
3.
Push the microswitch (C, Fig. 7) downwards to WET
position.
WARNING
Do not move the adjacent switch (D, Fig. 7).
4.
Reinstall the electrical component box cover (B, Fig. 7)
and tighten the screws (A).
Battery Installation
5.
Disconnect the vacuum hose (A, Fig. 8) from the
squeegee (B).
6.
Disconnect the recovery tank drain hose (C, Fig. 8) from
the bracket (D).
7.
Open the cover (A, Fig. 9) and apply the cover stand (B).
8.
Grasp the recovery tank (C, Fig. 9) in the area (D) and lift
it, as shown in the figure, then disconnect the vacuum
hose (E) from the tank and remove the tank (C) together
with the hoses (F) and (G).
9.
Install the batteries on the machine according to the
diagram (E, Fig. 8).
10. Reinstall the tank (C, Fig. 9) by carrying out steps 5 to 9
in the reverse order.
Battery Charging
11. Charge the batteries (see the relevant procedure in the
Maintenance chapter).
12
BATTERY
SETTING,
Figure 7
Figure 8
Figure 9
Operator's Manual - Vantage 17 Battery