(WET OR GEL) BATTERY SETTING, INSTALLATION
AND CHARGING
The electrical board of the machine is to be set according to
the type of batteries installed, either gel (GEL) or lead (WET).
Proceed as follows:
Machine Setting
1.
The machine factory setting is for GEL batteries; if this
setting corresponds to the type of batteries bought, go to
step 5. Otherwise, carry out steps 2, 3, and 4 too.
Remove the screws (A, Fig. 7) and carefully pull out the
2.
electrical component box cover (B).
3.
Push the microswitch (C, Fig. 7) downwards to WET
position.
WARNING!
Do not move the adjacent switch (D, Fig. 7).
Reinstall the electrical component box cover (B, Fig. 7) and
4.
tighten the screws (A).
Battery Installation
5.
Disconnect the vacuum hose (A, Fig. 8) from the squeegee
(B).
6.
Disconnect the recovery tank drain hose (C, Fig. 8) from the
bracket (D).
Open the cover (A, Fig. 9) and apply the cover stand (B).
7.
Grasp the recovery tank (C, Fig. 9) in the area (D) and lift
8.
it, as shown in the igure, then disconnect the vacuum hose
(E) from the tank and remove the tank (C) together with the
hoses (F) and (G).
9.
Install the batteries on the machine according to the diagram
(E, Fig. 8).
Reinstall the tank (C, Fig. 9) by carrying out steps 5 to 9 in
10.
the reverse order.
Battery Charging
Charge the batteries (see the relevant procedure in the
11.
Maintenance chapter).