Kessel Minilift S Notice D'utilisation D'origine page 42

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 47
5.
Commissioning
▶ Check whether the steps explained in the chapter on assembly have been
carried out correctly.
▶ Clear any building waste from the tank if necessary.
▶ Connect the system to the power supply. Lift the float switch to check whether
the submersible pump starts automatically.
✓ Connecting the connection cable(s) to the power supply switches the system
on.
L Dry running of the pump must be avoided.
42
Installation and operating manual
016-083_02

Publicité

Table des Matières
loading

Table des Matières