4.
Assembly
4.1
Setting the system in place
▶ The tank must be aligned vertically on a clean layer.
Alternatively, the tank can also be fixed in place using threaded rods (max. M10)
which are inserted through the eyelets on the edge of the tank.
▶ The profile lip seal must be placed in the tank groove.
▶ Determine the height to the planned floor level, checking whether the installati-
on of an additional extension section is necessary.
The upper section is height-adjustable. However, the minimum insertion depth
(47 mm) of the upper section must be taken into account. The upper section can
be shortened accordingly if necessary.
▶ Assemble the upper section and the cover provisionally.
L The cover also serves as protection during construction work.
L To ensure easier removal of the upper section, the profile lip seal can be
greased later.
32
Installation and operating manual
Max.
Fig. [4]
016-083_02