Electric Heating For The Display Version; Turning Off The Machine - Astoria Core600 Manuel D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour Core600:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83

6.3.3 Electric heating for the DISPLAY version

• Press the machine's main
switch (2);
• Wait another second or so
for the automatic test to be
carried out;
XPV35 XXXX
FW ver. 01.09
Controller Board
FW ver. 1.15
• Wait for the water in the boiler to be automatically
refilled, if this is necessary;
48
°C
• Wait a few moments until the machine has been fully
heated up;
53
°C
• If the timeout intervenes, a red flashing warning will
appear on the display.
USER manual
2
Heating-up phase
Boiler water filling
phase (yellow colour)
Heating-up phase
Boiler water OK (green
colour)
Flashing red
colour
Flashing yellow
colour
6.3.4 Gas heating
(if gas system is present)
• Turn the power switch (A) to position 1;
• Open the gas valve (B) on the mains;
• Hold down the push button (C) and, at the same
time, press the on button (D). Once the flame ignites,
hold down knob (C) for a few seconds, to allow the
thermocouple to activate correctly;
• Then check that the flame has ignited through the
window (E);
• Wait for the operating pressure indicated on the
pressure gauge to reach a working value of 0,1-0,12
MPa (1-1,2 bar);
B
6.3.5 Electric + gas heating
• Proceed as indicated in the previous paragraph;
• After checking that the flame has ignited, turn the
power switch (A) to position 2. In this way the boiler's
heating element is powered and the operating pres-
sure will be reached more quickly;
• Wait for the operating pressure indicated on the pres-
sure gauge to reach the working value of 0,1-0,12
MPa (1-1,2 bar).
During the machine's heating-up phase (roughly 20 minutes), the
negative pressure valve will release steam for a few seconds until
the valve closes.
Do not open the gas mains when the boiler is empty.

6.3.6 Turning off the machine

Turn off the machine using the main switch or power
switch.
A
D
C
E
(if gas system is present)
57
288
of

Publicité

Table des Matières
loading

Table des Matières